Rome Braves


March, 2003


The infield is clearly markedThe seats are ready to be installed
Beyond the seating on the thrid-base side, the outfield appears ready for sodThe front of the almost-finished stadium

February, 2003


The press and luxury box areas of the stadium are nearing completionThe field is being smoothed in preparation for sod to be put down
The stadium sits ready for the new seats to be installedThe front of the almost-finished stadium

January, 2003


The third-base side of the stadium is nearly completeThe main entrance into the seating area viewed from the outside of the stadium
The main entrance to the stadium nearing completionThe First-base side of the stadium, as viewed from the outside, nears completion

December, 2002


The first-base side of the stadium entranceThe main entrance into the seating area behind home plate from the outside
soon, there will be a facade on these walls welcoming fans to a completed stadiumRoof work nears completion
The first-base side of the stadium nears completionThe main entrance into the seating area behind home plate
soon, there will be sod and a baseball diamond where this field view behind home plate is shownThe stadium from a distance

November, 2002


Cranes stand ready to position steel roof sections into placeCranes stand ready to position steel roof sections into place
The steel roofing is being installed in this photoFirst-base side of the stadium viewed from outside
Two cranes tower above the new stadiumThe SPLOST Sign looks much better with a stadium behind it
The new Seating area ready for seats to be installedThe new Seating area ready for seats to be installed
The new Seating area ready for seats to be installedThe new Seating area ready for seats to be installed

October, 2002


A crane lifts a new steel beam into placeThe First-base section of the stadium is seen here from outdise the ballpark
A view of the stadium from inside and behind home plateThe third-base side of the stadium is seen here

September, 2002


A concrete wall lies next to a busy CaterpillarThe stadium foundation where the seating sections will soon be installed
Wooden supports hold the concrete walls as they dryThe outer edge of the stadium
The foundation walls run deep for added strength

August, 2002


A concrete boom truck lays the foundationA concrete boom truck lays the foundation

July, 2002

Soon the field will be filled with grass, red dirt, and baseball players.The foundation for the stadium is being prepared
The foundation for the stadium is being preparedThe foundation for the stadium is being prepared
The SPLOST sign standing at the construction site


Opening Day is April 5, 2007
Three Rivers Club - join us for lunch and more!
Miracle Field of Rome

Rome Braves • 755 Braves Boulevard • Rome, Georgia 30161
Office (706) 368-9388 • Fax (706) 368-6525 • Tickets (706) 378-5144
For questions or comments please e-mail rome.braves@braves.com

Privacy Policy | Website Terms of Use